srinakarin

Location :

Sapansoong, Bangkok Metropolitan Province

Client :

Department of Public Work, Bangkok Metropolitan Administration

Project Description :

Construction of 8 lane reinforced concrete road and associated works from Klong Wangmai to Highway No.9.

Type of Services :

Construction Management and Supervision

Scope of Works :

Construction management and supervision of 8 lane reinforced concrete road with sidewalks, roadway bridges, pedestrians crossing, drainage system, road lighting, traffic sign and associated works.

Project Costs :

584.40 Million baht

Consultant Fee :

14.97 Million baht

Project Period :

September 2015 – August 2017

Project Components :

  1. Main road : 2 ways 8 lanes reinforced concrete road distance is about 2,000 m.
  2. Frontage road : 2 ways 2 lanes reinforced concrete road distance is about 825 m.
  3. Ramp : No.1, 2, 5
  4. Roadway bridge (main road and frontage road) : Klong Tabchang Lang and Klong Luang.
  5. Pedestrian crossing : 2 nos.
  6. Drainage system : reinforced concrete pipe dia. 1000 mm.
  7. Retaining wall : Along right of way about 2-1400 m length.
  8. Road Lighting
  9. Traffic sign.